Construction and
modular coordination
The previously freely designed project for a multi-storey
residential building in a gap between buildings was
now to be developed as a timber frame construction.
Challenges such as the protruding arcades and the
resulting irregular floor plans were met with suitable
structural means. The design was finally realized as a
pure timber construction in the planning. In addition, a
rough ventilation concept and the location of sanitary
routes were developed, as well as a view of the
necessary fire protection. Models were produced at a
scale of 1:20, allowing the chosen timber construction
to be clearly presented.